Here are some pictures of the second bathroom we gutted to the studs and rebuilt in roughly one week.  In this bathroom we had to repair a lot of previous plumbing work.  We re-vented the washer and dryer properly and put the drain in the floor as it should have been done originally.  The previous owners had built a shower on a 2×6 platform because they didn’t know how to get it in the floor.  Thanks for looking and we hope to work with you on your project.